Mercure Hotel Delémont | Hotel in Delémont
Hotel in Delemont, Delémont
Comfortable Accommodations
Mercure Hotel Delémont in Delémont offers family rooms with air-conditioning, private bathrooms, and city views. Each room includes a work desk, free toiletries, and a wardrobe.Exceptional Facilities
Guests can enjoy a sauna, sun terrace, and bar. Additional amenities include a lounge, outdoor fireplace, and electric vehicle charging station.Dining Options
A continental buffet breakfast is served with local specialties, warm dishes, fresh pastries, and fruits. The hotel also features a coffee shop and outdoor seating area.Prime Location
Located 32 mi from EuroAirport Basel, the hotel is near attractions such as LaLargue Golf and Country Club (21 mi) and Dreiländermuseum (30 mi). Guests appreciate the friendly staff and comfortable rooms.Mercure Hotel Delémont is located in Delémont.
This 44 Bedrooms Hotel is suitable for tourists and travelers. It has several amenities that would guarantee your comfort. These amenities include: Sports/Activities, Wellness Facilities, Bar, and several others. This is a 4 star rated property and has over 462 reviews with the average score of 8.6 . Coming to Delémont and needing a place to stay? Be it for work or for leisure, consider staying at this Hotel for your next visit, you will surely love it.
You can check the reviews and description of this 44 Bedrooms Hotel if you want to learn more about this place in Delémont. These details are authentic, as they are provided by our partner, booking.com.
This Mercure Hotel Delémont in Delémont is well equipped and has all facilities that have been listed below. Please note that these details were shared to us by booking.com for the listed “Mercure Hotel Delémont”. We solely rely on their shared details and are regarded as “accurate”. If you have any concerns about the information or accuracy describing this Hotel, please let us know.
Amenities
Facility Overview
-
Breakfast in the room
-
Kid-friendly buffet
-
Snack bar
-
Coffee house on site
-
Special diet meals (on request)
-
Bar
-
Fruit
-
Wine/Champagne
-
Parking garage
-
Parking
-
Electric vehicle charging station
-
Parking on site
-
Accessible parking
-
Skiing
-
Temporary art galleries
-
Hiking
-
Horseback riding
-
Sauna
-
Live sports events (broadcast)
-
Walking tours
-
Cycling
-
Smoke-free property
-
Heating
-
Soundproof rooms
-
Air conditioning
-
Elevator
-
Safe
-
Facilities for disabled guests
-
Non-smoking rooms
-
Family rooms
-
Shared lounge/TV area
-
Express check-in/out
-
Baggage storage
-
Private check-in/out
-
Daily housekeeping
-
Meeting/Banquet facilities
-
Room service
-
Ironing service
-
Tour desk
-
Laundry
-
ATM on site
-
Fax/Photocopying
-
Invoice provided
-
Outdoor furniture
-
Outdoor fireplace
-
Terrace
-
Sun deck
-
CCTV outside property
-
Smoke alarms
-
Fire extinguishers
-
Security alarm
-
Key card access
-
Key access
-
CCTV in common areas
-
24-hour security
-
Linens, towels, and laundry washed in accordance with local authority guidelines
-
Guests have the option to cancel any cleaning services for their accommodation during their stay
-
Guest accommodation disinfected between stays
-
Use of cleaning chemicals that are effective against coronavirus
-
All plates, cutlery, glasses, and other tableware sanitized
-
Physical distancing in dining areas
-
Food can be delivered to guest accommodation
-
Breakfast to-go containers
-
First aid kits available
-
Thermometers for guests provided by property
-
Face masks for guests available
-
Process in place to check health of guests
-
Access to healthcare professionals
-
Staff follow all safety protocols as directed by local authorities
-
Hand sanitizer in guest accommodation and common areas
-
Shared stationery (e.g. printed menus, magazines, pens, paper) removed
-
Cashless payment available
-
Physical distancing rules followed
Policies
Reviews
Room Arrangement
| Room Info | Facilities |
|---|---|
|
Classic Queeen Room
Room Type:
Double
Room Size:
24 m2
|
Food & DrinkTea/Coffee makerBathroomHairdryer, Shower, Private bathroom, Toilet, Toilet paper, Free toiletriesGeneralSafety deposit box, Air conditioning, Heating, Trash cans, Carpeted, Private entrance, Smoke AlarmLiving AreaDeskBedroomCribs, Wardrobe or closet, Walk-in closetViewCity viewAccessibilityAccessible by elevator, Upper floors accessible by elevator |
|
Classic Superior Queen Room with Sofa
Room Type:
Triple
Room Size:
28 m2
|
Food & DrinkTea/Coffee makerBathroomHairdryer, Shower, Private bathroom, Toilet, Toilet paper, Free toiletriesGeneralSafety deposit box, Air conditioning, Heating, Trash cans, Carpeted, Private entrance, Smoke AlarmLiving AreaDesk, SofaBedroomCribs, Wardrobe or closet, Walk-in closetViewCity viewAccessibilityAccessible by elevator, Upper floors accessible by elevatorRoom amenitiesSofa bed |
|
Classic Queen Room with Sofa
Room Type:
Triple
Room Size:
24 m2
|
Food & DrinkTea/Coffee makerBathroomHairdryer, Shower, Private bathroom, Toilet, Toilet paper, Free toiletriesGeneralSafety deposit box, Air conditioning, Heating, Trash cans, Carpeted, Private entrance, Smoke AlarmLiving AreaDesk, SofaBedroomCribs, Wardrobe or closet, Walk-in closetViewCity viewAccessibilityAccessible by elevator, Upper floors accessible by elevatorRoom amenitiesSofa bed |
|
Privilege King Room with Armchair
Room Type:
Double
Room Size:
26 m2
|
Food & DrinkTea/Coffee makerBathroomHairdryer, Shower, Private bathroom, Toilet, Toilet paper, Free toiletriesGeneralSafety deposit box, Air conditioning, Heating, Trash cans, Carpeted, Private entrance, Smoke AlarmLiving AreaDeskBedroomCribs, Wardrobe or closet, Walk-in closetKitchenCoffee machineViewCity viewAccessibilityAccessible by elevator, Upper floors accessible by elevator |
|
Junior King Suite with Lounge
Room Type:
Suite
Room Size:
32 m2
|
Food & DrinkTea/Coffee makerBathroomHairdryer, Shower, Private bathroom, Toilet, Toilet paper, Free toiletriesGeneralSafety deposit box, Air conditioning, Heating, Trash cans, Carpeted, Private entrance, Smoke AlarmLiving AreaDesk, Seating areaBedroomCribs, Wardrobe or closet, Walk-in closetKitchenCoffee machineViewCity viewAccessibilityAccessible by elevator, Upper floors accessible by elevatorRoom amenitiesSofa bed |
|
Classic Twin Room
Room Type:
Double
Room Size:
24 m2
|
Food & DrinkTea/Coffee makerBathroomHairdryer, Shower, Private bathroom, Toilet, Toilet paper, Free toiletriesGeneralSafety deposit box, Air conditioning, Heating, Trash cans, Carpeted, Private entrance, Smoke AlarmLiving AreaDeskBedroomCribs, Wardrobe or closet, Walk-in closetViewCity viewAccessibilityAccessible by elevator, Upper floors accessible by elevator |
FAQ's
Is this property pet-friendly for guests?
No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.
What time is check-in & check-out at property?
Check-in time for Mercure Hotel Delémont starts counting from 3:00 PM and check-out is until 12:00 PM. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.
Does the property have a swimming pool?
No, this Mercure Hotel Delémont does not have a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.
How much does it cost per night to stay in property?
Best-rates for the Mercure Hotel Delémont starts from $163 per night with includes Fireplace, Heating, Restaurant, Air Conditioner, Parking, TV, Accessibility, Security/Safety, Business Services, Entertainment, Balcony/Terrace, Skiing, Guest Services, Child Friendly, Laundry, Sports/Activities, Wellness Facilities, Bar, Breakfast, Wheelchair Accessible, EV Charge Station with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.
Is property a family-friendly place to stay?
Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this hotel 4 stars or guests have recommended them suitable for families. As reported by the owner or manager, the hotel has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.
Is the property wheelchair accessible or offer services for disabled guests?
Based on the information received from our partner, the Mercure Hotel Delémont is wheelchair accessible. Likewise, there is an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.
What is the minimum night stay policy for the property?
Based on the information reported by the owner or manager, the Mercure Hotel Delémont indicates 1 day stay policy at this hotel. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.
What cancellation policy is in place for property?
Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.